|
 | | | Al Maha Desert Resort | | | Arabtec is proud to be associated with prestigious Al Maha Desert Resort Project for Emirates Airlines. Voted as the ‘Best Small Resort Hotel in the World’, Arabtec Carried Out the entire construction and fitting out of the resort. ... |
|
Top |
| |
|
 | | | Sharjah Art Gallery | | | Now a landmark in Sharjah, this Art Gallery features traditional wind towers built with modern techniques and very ornate interior finishes. ... |
|
Top |
| |
|
 | | | Carrefour Marina Mall | | | Carrefour is one of the popular shops in Marina Mall Abu Dhabi, the second largest mall of the Abu Dhabi Emirate, strategically located in the Water Breaker area next to Corniche Hotel. ... |
|
Top |
| |
|
 | | | CineStar, Abu Dhabi | | | Built to a very high specification in a very short period and involving international procurement, these cinemas have revolutionised movie watching in the U.A.E. ... |
|
Top |
| |
|
 | | | CineStar – Ajman City Centre | | | With a contract value of AED15 million, the scope of the project is a fit-out to the six-screen Cineplex. The fit-out works started in June 1999 and was completed in November 2000. ... |
|
Top |
| |
|
 | | | Corniche Coffee Shop, Abu Dhabi | | | Corniche Coffee Shop is located along Corniche Road, Abu Dhabi. The coffee shop is owned by the Ministry of Public Works of Abu Dhabi. ... |
|
Top |
| |
|
 | | | Magic Planet, Deira City Centre | | | The project was to upgrade the Magic Planet at Deira City Centre, Dubai, U.A.E. This project totalled a contract value of AED7 million which started in September 2001 and was completed in February 2002. ... |
|
Top |
| |
|
 | | | Food Court at Marina Mall, Abu Dhabi | | | This project is a foodcourt fit out totaling a contract value of AED8.2 million. It commenced in November 2001 and the fit out works was completed in April 2001. ... |
|
Top |
| |
|
 | | | New Mosque at TLC East , Jebel Ali | | | The Mosque is located in the JAFZ (Jebel Ali Freezone) area and serving the residents of the TLC East Accommodation. The development started in September 1996 and was completed in May 1998 with a contract value of AED3.7 million. ... |
|
Top |
| |
|
 | | | Shk. Saud Al Qassimi Mosque, Sharjah | | | The mosque is located at Al Shahbaa Area, Sharjah. With a total contract value of AED 9 million, the mosque was completed in December 1995 for a construction period of 22 months. ... |
|
Top |
| |
|
 | | | Zabeel Palace Gatehouse | | | This project by His Highness Shk. Mohammed Bin Rashid Al Maktoum has a contract value of AED4 million. The works being carried is the construction of the palace’s gatehouse which commenced in May 1997 and was completed in November of the same year. ... |
|
Top |
| |
|
 | | | Al Jadaf Mosque | | | The Al Jadaf Mosque follows the Andalusia type, Moroccan architecture, which is evident in the types of arches and columns, domes and also minaret. ... |
|
Top |
| |